Intercoastal Marine / Smith-Rowe prepare for new Bridge over Cape River
Intercoastal Marine / Smith-Rowe prepare for new Bridge over Cape River in Elizabethtown, NC using Poseidon P2 7 ft and P-10 10 ft barges. Thanks for the continued business!
Intercoastal Marine / Smith-Rowe prepare for new Bridge over Cape River in Elizabethtown, NC using Poseidon P2 7 ft and P-10 10 ft barges. Thanks for the continued business!
Some great video footage of Better by Design performing the South Fork Protection project at Mark Twain Lake. Better by Design is a Brookfield, MO company that picked Poseidon Barge to supply their barge needs. Thank you for your business and for allowing us to be a part of this project!
Jerome Lemanowicz joined the Poseidon Barge, LTD in early 2021 to fill the position left by the transfer of Carl Piedmont from the Northeast to the West Coast.
Poseidon Barge, LTD is proud to announce that Carl Piedmont has accepted the West Coast Territory Sales Manager position.
Dredgit Corporation recently used Poseidon P1 40x10x5 barges to support a Linkbelt 250-4 Long Reach Excavator on their project in San Angelo, TX.
Many thanks to Indiana Senator Mike Braun and Indiana State Representative for District 79, Matt Lehman, for visiting Poseidon Barge’s facility. An informative tour was given of the production facility where our high quality products are manufactured.
Our customer, Veit from Rogers, MN and our sectional barges, were featured in an article for ENR. Both Veit and Poseidon Barge have been involved with several projects in the Duluth, MN area that are impacting the environment in a very positive manner.
D Construction using Poseidon P1 5ft barges to support a diffuser operation and a pile driving rig.
Poseidon Barge Listing in Modern Contractor’s 2021 Buyers Guide Read More Learn More
Download the Current Product Brochure