POSEIDON BARGES USED AS A TEMPORARY BRIDGE
News
McKeil Marine used their Poseidon P1 5 ft tall barges to create a temporary road for crossing the Campbellford Generator. A 100’x40’ x 5’ Poseidon Barge deck was created and covered with crane mats.
Posted In: Featured, News, P1 Sectional Barge, Projects
In 2020 a lot of exciting things have happened despite the Covid-19 Pandemic. We completed a much needed expansion, we obtained ISO certification (only sectional barge manufacturer in North America to do so!), and we surpassed a decade of membership in the Association of Equipment Manufacturers.
Read morePosted In: Featured, News, P2 Sectional Barge, Projects
Ames Construction from Burnsville, MN works on the new bridge in Sandpoint, ID. They are using Poseidon P1 5 ft barges, and Poseidon P2 7ft barges to float their equipment.
Posted In: Featured, News, P1 Sectional Barge, P2 Sectional Barge, Projects
Smith-Rowe Construction / Intercoastal Marine continues the demo on the existing US Hwy 701 Bridge in Elizabethtown, NC. They using a platform of Poseidon P2 7ft Sectional Barges to float their crane while performing the heavy lifting.
Posted In: Featured, News, P2 Sectional Barge, Projects
A beautiful picture of our long time customer, Sevenson Environmental Services, hard at work.
Posted In: Featured, News, P2 Sectional Barge, Projects