POSEIDON BARGES USED AS A TEMPORARY BRIDGE
News
Our customer, Veit from Rogers, MN and our sectional barges, were featured in an article for ENR. Both Veit and Poseidon Barge have been involved with several projects in the Duluth, MN area that are impacting the environment in a very positive manner.
Posted In: Featured, News, P2 Hopper Sectional Barge
D Construction using Poseidon P1 5ft barges to support a diffuser operation and a pile driving rig.
Posted In: Featured, News, P1 Sectional Barge, Projects
McKeil Marine used their Poseidon P1 5 ft tall barges to create a temporary road for crossing the Campbellford Generator. A 100’x40’ x 5’ Poseidon Barge deck was created and covered with crane mats.
Posted In: Featured, News, P1 Sectional Barge, Projects
In 2020 a lot of exciting things have happened despite the Covid-19 Pandemic. We completed a much needed expansion, we obtained ISO certification (only sectional barge manufacturer in North America to do so!), and we surpassed a decade of membership in the Association of Equipment Manufacturers.
Read morePosted In: Featured, News, P2 Sectional Barge, Projects
Ames Construction from Burnsville, MN works on the new bridge in Sandpoint, ID. They are using Poseidon P1 5 ft barges, and Poseidon P2 7ft barges to float their equipment.
Posted In: Featured, News, P1 Sectional Barge, P2 Sectional Barge, Projects