McKeil Marine used their Poseidon P1 5 ft tall barges to create a temporary road for crossing the Campbellford Generator. A 100’x40’ x 5’ Poseidon Barge deck was created and covered with crane mats.
Posted In: Featured, News, P1 Sectional Barge, Projects
Posted In: Featured, News, P2 Sectional Barge, Projects
Ames Construction from Burnsville, MN works on the new bridge in Sandpoint, ID. They are using Poseidon P1 5 ft barges, and Poseidon P2 7ft barges to float their equipment.
Posted In: Featured, News, P1 Sectional Barge, P2 Sectional Barge, Projects
Smith-Rowe Construction / Intercoastal Marine continues the demo on the existing US Hwy 701 Bridge in Elizabethtown, NC. They using a platform of Poseidon P2 7ft Sectional Barges to float their crane while performing the heavy lifting.
Posted In: Featured, News, P2 Sectional Barge, Projects
A beautiful picture of our long time customer, Sevenson Environmental Services, hard at work.
Posted In: Featured, News, P2 Sectional Barge, Projects
CR Meyer and Sons performs rehab work on the Wausua Hydro Dam. They are using Poseidon P1 barges as their platform. Special thanks to Mike Nault for his time during our visit to the site!
Posted In: Featured, News, P1 Sectional Barge, Projects
Canada Pump and Power has equipped the Poseidon P1 barges they purchased with this gantry crane. An awesome use of their Poseidon Barges!
Posted In: Featured, News, P1 Sectional Barge, Projects
Lunda Construction Company Headquartered in Black River Falls, WI I-74 River Bridge project
Posted In: Featured, News, P10 Sectional Barge, Projects
Reed & Reed using P2 7ft barges to lay cable in Seneca County, NY
Posted In: Featured, News, P2 Sectional Barge, Projects
Thank you Harbor Hawk for choosing Poseidon Barge’s P1 5ft barges for your shoreline operations!
Posted In: Featured, News, P1 Sectional Barge, Projects
Burrows Brothers won’t let the cold stop them or their Poseidon P2 7 ft barges!