Category: P2 componibile Barge

Vigor Industrial P2-7

Vigor Industrial Uses Poseidon P2-7’s in Ketchikan Alaska Vigor Industrial floats off a 125ton vehicle transfer bridge from a stationary floating cruise ship berth in Ketchikan Alaska. Utilizing 4ea Poseidon P2 floats, vertical 4’ steel piping sections, & legno congelamento, sono stati in grado di utilizzare naturale galleggiamento di marea per raggiungere questo ascensore. Per saperne di più

Leggi di più

Bigge Crane utilizza Poseidon Chiatte in fretta per salvare Oroville Dam

POSEIDON BARGES USED AS A TEMPORARY BRIDGE Bigge Crane uses Poseidon Barges in rush to save oroville dam Bigge was a first responder to the Oroville Dam state of emergency in Northern California. Bigge rented and delivered a Liebherr LR1300 crawler within 48 hrs. The crane lifted and set Poseidon® P2-7′ Barges into the reservoir. […]

Leggi di più