New Tutorial: Poseidon Barge P2 7ft Barge Connection Instructions
https://www.youtube.com/watch?v=ln4-gK_beyE
https://www.youtube.com/watch?v=ln4-gK_beyE
to perform maintenance at Byllersby Dam in Ivanhoe, VA.
Accounting Clerk/Administrative Assistant
This terrible disease has touched each one of us in some way, either personally or with someone we know. Early detection is your best defense, please get your annual screening.
Thank you for your business!
Some great video footage of Better by Design performing the South Fork Protection project at Mark Twain Lake. Better by Design is a Brookfield, MO company that picked Poseidon Barge to supply their barge needs. Thank you for your business and for allowing us to be a part of this project!
Jerome Lemanowicz joined the Poseidon Barge, LTD in early 2021 to fill the position left by the transfer of Carl Piedmont from the Northeast to the West Coast.
Poseidon Barge, LTD is proud to announce that Carl Piedmont has accepted the West Coast Territory Sales Manager position.
Dredgit Corporation recently used Poseidon P1 40x10x5 barges to support a Linkbelt 250-4 Long Reach Excavator on their project in San Angelo, TX.
Many thanks to Indiana Senator Mike Braun and Indiana State Representative for District 79, Matt Lehman, for visiting Poseidon Barge’s facility. An informative tour was given of the production facility where our high quality products are manufactured.
Download the Current Product Brochure