D Construction using Poseidon P1 5ft barges
D Construction using Poseidon P1 5ft barges to support a diffuser operation and a pile driving rig.
D Construction using Poseidon P1 5ft barges to support a diffuser operation and a pile driving rig.
Poseidon Barge Listing in Modern Contractor’s 2021 Buyers Guide Read More Learn More
Our owners, Donnie Fain & Mary Habegger-Fox braved the snow to make a huge pot of “Kentucky Burgoo” A modern version of a soup from Donnie’s childhood.
McKeil Marine used their Poseidon P1 5 ft tall barges to create a temporary road for crossing the Campbellford Generator. A 100’x40’ x 5’ Poseidon Barge deck was created and covered with crane mats.
In 2020 a lot of exciting things have happened despite the Covid-19 Pandemic. We completed a much needed expansion, we obtained ISO certification (only sectional barge manufacturer in North America to do so!), and we surpassed a decade of membership in the Association of Equipment Manufacturers.
Legacy Contracting continues their winning “legacy” using Poseidon P2 5 ft Barges. Legacy Contracting used Poseidon P2 5ft Barges on the Port Angeles, construction of the new Terminal 3 Headline Dolphin (a concrete structure supported by steel piling). It was the company’s second PDCA Project of the Year Award winner for 2018. Learn More
Ames Construction from Burnsville, MN works on the new bridge in Sandpoint, ID. They are using Poseidon P1 5 ft barges, and Poseidon P2 7ft barges to float their equipment.
Picture of the Week: We are very honored to announce that Poseidon Barge Ltd. is now ISO 9001:2015 certified! Our team did a great job over the past several months to achieve this accomplishment.
Piling Canada – Quarter 3, 2020
Smith-Rowe Construction / Intercoastal Marine continues the demo on the existing US Hwy 701 Bridge in Elizabethtown, NC. They using a platform of Poseidon P2 7ft Sectional Barges to float their crane while performing the heavy lifting.
Download the Current Product Brochure