Category: P2 Sectional Barge

Legacy Contracting continues their winning “legacy” using Poseidon P2 5 ft Barges.

Legacy Contracting continues their winning “legacy” using Poseidon P2 5 ft Barges. Legacy Contracting used Poseidon P2 5ft Barges on the Port Angeles, construction of the new Terminal 3 Headline Dolphin (a concrete structure supported by steel piling). It was the company’s second PDCA Project of the Year Award winner for 2018.

Read More

Vigor Industrial P2-7

Vigor Industrial Uses Poseidon P2-7’s in Ketchikan Alaska Vigor Industrial floats off a 125ton vehicle transfer bridge from a stationary floating cruise ship berth in Ketchikan Alaska. Utilizing 4ea Poseidon P2 floats, vertical 4’ steel piping sections, & hardwood blocking they were able to utilize natural tidal buoyancy to accomplish this lift.

Read More

Bigge Crane uses Poseidon Barges in rush to save Oroville Dam

POSEIDON BARGES USED AS A TEMPORARY BRIDGE Bigge Crane uses Poseidon Barges in rush to save oroville dam Bigge was a first responder to the Oroville Dam state of emergency in Northern California. Bigge rented and delivered a Liebherr LR1300 crawler within 48 hrs. The crane lifted and set Poseidon® P2-7′ Barges into the reservoir. […]

Read More