POSEIDON BARGES USED AS
A TEMPORARY BRIDGE
POSEIDON’S® NEW FABRICATION PLANT OPENS!
![IMG_2202-w-530x340](https://www.poseidonbarge.com/wp-content/uploads/2018/07/IMG_2202-w-530x340-530x340.jpg)
POSEIDON® BARGE OPENS ITS NEW PRODUCTION FACILITY IN BERNE, IN
Poseidon® Barge has expanded it’s production capabilities by opening a new production facility in Berne, IN. Poseidon® Barge was leasing a smaller property across the street when this facility became available.
Poseidon® increased it’s production capacity by adding two more production lines. In addition, the property is large enough to expand in the future.
![Donnie-2](https://www.poseidonbarge.com/wp-content/uploads/2018/07/Donnie-2-611x351.jpg)
Signing of the first barge off the line was christened by Donnie Fain, owner and founder of Poseidon® Barge.
![Dale-Speech](https://www.poseidonbarge.com/wp-content/uploads/2018/07/Dale-Speech-611x329.jpg)
Thanks to Mary Habegger-Fox, President & CFO and Dale Bullion, Operations & Safety Manager for their hard work managing the contractors and purchasing new equipment needed to fabricate the best sectional barge in the industry!